Skip to main content

Corporate Social Responsibility – Bauleni Footbridges

By July 13, 2019September 13th, 2019Uncategorised

NMSI are jointly contributing with Suscon to the design, fabrication and installation of two footbridges across a wide, deep and dangerous drainage culvert in Central Bauleni, which has tragically claimed the lives of several toddlers in recent months.

The central Bauleni footbridges site was visited to measure the various levels on either side of the embankments to mark the best location for the foundations of the two bridges. During the first week of construction, the workers dug the foundations and the civil contractor cast a 50mm layer of concrete at the bottom of each foundation. Following this, rebars were placed and concrete was cast ready, so the fabrication of the structural steel pieces could begin. The footbridges were constructed off-site and when completed, were transported by lorry to the Bauleni site where they awaited the installation process.