Installation, Commissioning, Maintenance and Training (ICMT); November 2020

By January 4, 2021Uncategorised

The planned Equipment End User Training was held at Nachibibi Mini Hospital and completed between 3 – 5 November 2020, covering the following facilities in the Luapula and Central Provinces:

  • Edgar Changwa Lunga
  • Chengo
  • Mwimbula
  • Katikulula
  • Katondo
  • Makululu

Fumigation and pest control was carried out at the Edgar Chagwa Lungu and Chengo Mini Hospitals on 21/22 November, before the Installation, Commissioning and Acceptance testing of Medical and Non-Medical Equipment commenced on the 24/25 November. This was signed off by the Provincial Biomedical Engineer and IT specialist on 28 November 2020.

The two teams moved to Katondo and Makululu Mini Hospital sites in completion of Installation, Commissioning and Acceptance testing on 30 November 2020.